- Permit requirement stated
- Who files and pays
- Inspection scheduling
- Load calculation documentation if required
- Refrigerant and disposal handling
- Closed permit delivered
Questions worth asking
- Does this changeout require a permit?
- Who files it, and is the fee included?
- Who schedules and attends the mechanical inspection?
- Is a load calculation required, and will I get a copy?
- How is old refrigerant recovered and documented?
- Will I receive the closed permit?
Run your own quote
Paste or upload the estimate. The free scan lists the sections it found, the sections that look missing or unclear, and a question list you can send to the contractor. It does not tell you whether a price is fair, because that is not something a document review can answer.
Open the free scanSee a sample reportAll sample reportsFrequently asked
What is a load calculation?
Sizing work that matches equipment capacity to the house. Some jurisdictions require it, and it also protects you from oversizing.
Does permitting delay installation?
Sometimes by days. Ask how it affects your start window before scheduling around it.
Free checklists
Printable checklists you can take into the conversation.
Free checklistsEducational checklist only. Not legal, engineering, pricing, contractor-vetting, or building-code advice. This does not decide whether a price is fair or which contractor to hire. Verify everything with your own licensed professional and your local building department.
Independent tool. No contractor marketplace, no lead selling, no referral fees. Payment is not enabled, so nothing on this site can charge you.