- Cabinet line, box construction and door style named
- Countertop material with an allowance amount
- Appliance supply: who buys, who installs
- Plumbing and electrical relocation scope
- Flooring, backsplash and paint inclusion
- Kitchen downtime and temporary setup expectations
Questions worth asking
- Which cabinet line and construction are quoted, and is installation included?
- What countertop allowance is assumed, and per square foot at what grade?
- Who supplies appliances and who installs and connects them?
- Are any plumbing or electrical lines being moved, and is that priced?
- Are flooring, backsplash and paint inside this number?
- How many days will the kitchen be unusable?
Run your own quote
Paste or upload the estimate. The free scan lists the sections it found, the sections that look missing or unclear, and a question list you can send to the contractor. It does not tell you whether a price is fair, because that is not something a document review can answer.
Open the free scanSee a sample reportAll sample reportsFrequently asked
Why do kitchen quotes change mid-project?
Usually allowances and hidden conditions behind cabinets or walls. Naming both up front is what keeps the number stable.
Should appliances be in the contractor quote?
Either way works, but it must be stated. Homeowner-supplied appliances still need installation scope written down.
Free checklists
Printable checklists you can take into the conversation.
Free checklistsEducational checklist only. Not legal, engineering, pricing, contractor-vetting, or building-code advice. This does not decide whether a price is fair or which contractor to hire. Verify everything with your own licensed professional and your local building department.
Independent tool. No contractor marketplace, no lead selling, no referral fees. Payment is not enabled, so nothing on this site can charge you.