← Contractor Quote AuditorWhat to check on the estimate
- Scope written area by area
- Materials named with models
- Exclusions section
- Permit responsibility
- Warranty split into labor and parts
- Payment schedule tied to milestones
Questions worth asking
- Which of these eight sections is missing: scope, materials, exclusions, permits, warranty, timeline, payment, license?
- Can each missing section be added in writing before I sign?
- Which omission would cost the most if it went the wrong way?
- Which omissions are standard for this trade?
- Can you re-issue the quote with these sections filled in?
- What is your price validity period on the revised quote?
Run your own quote
Paste or upload the estimate. The free scan lists the sections it found, the sections that look missing or unclear, and a question list you can send to the contractor. It does not tell you whether a price is fair, because that is not something a document review can answer.
Open the free scanSee a sample reportAll sample reportsFrequently asked
What is the fastest way to find omissions?
Paste the quote into the free scan. It lists the sections it can and cannot find and turns each gap into a question.
Does a missing section mean a bad contractor?
No. Many good contractors write short quotes. It means you have questions to ask, not a verdict to deliver.
Free checklists
Printable checklists you can take into the conversation.
Free checklistsEducational checklist only. Not legal, engineering, pricing, contractor-vetting, or building-code advice. This does not decide whether a price is fair or which contractor to hire. Verify everything with your own licensed professional and your local building department.
Independent tool. No contractor marketplace, no lead selling, no referral fees. Payment is not enabled, so nothing on this site can charge you.